More Plant Categories

Laying and Distributing Plant

Location

National

Accreditation

NVQ

Duration

TBC

Valid for

Lifetime award

About this course

For  operators of binder spreaders.

The aim of this qualification is to recognise the knowledge, skills and competence demonstrated by an individual in the workplace. This Level 2 NVQ Certificate in Plant Operations ‐ Laying and Distributing Plant provides the opportunity for individuals who specialise in binder spreaders to demonstrate their competence. There is also a Level 2 Diploma in this occupational area. The units in this qualification are derived from National Occupational Standards.

The Rule of Combination (RoC) below specifies the combination of units that need to be achieved for the individual to be awarded the qualification.

Mandatory Units

  • Conforming to General Health, Safety and Welfare in the Workplace.

    A/503/1170

    Comply with all workplace health, safety and welfare legislation requirements., Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures., Comply with organisational policies and procedures to contribute to health, safety and welfare., Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area., Comply with and support all organisational security arrangements and approved procedures.

  • Conforming to Productive Working Practices in the Workplace

    J/503/1169

    Communicate with others to establish productive work practices., Follow organisational procedures to plan the sequence of work., Maintain relevant records in accordance with the organisational procedures., Maintain good working relationships when conforming to productive working practices.

Optional Units

  • Preparing and Operating Chipping Spreaders to Lay and Distribute Materials in the Workplace

    D/600/8071

    Interpret the given information relating to the use of chipping spreaders to carry out laying and distributing operations., Organise with others the sequence and operation in which laying and distributing operations using chipping spreaders are to be carried out., Know how to comply with relevant legislation and official guidance to carry out laying and distributing operations with chipping spreaders., Maintain safe working practices when preparing for and carrying out laying and distributing operations using chipping spreaders., Request and select the required quantity and quality of resources to prepare for and carry out laying and distributing operations using chipping spreaders., Minimise the risk of damage to the work and surrounding area when laying and distributing materials using chipping spreaders., Complete the work within the allocated time when preparing to and laying and distributing materials using chipping spreaders., Comply with the given contract information to lay and distribute materials using chipping spreaders to the required specification.

  • Preparing and Carrying Out Plant Operations from a Barge in the Workplace

    D/600/8104

    Interpret the given information relating to the plant operations from a barge., Organise with others the sequence and operation of plant from a barge are to be carried out., Know how to comply with relevant legislation and official guidance to carry out plant operations from a barge., Maintain safe working practices when preparing for and carrying out plant operations from a barge., Request and select the required quantity and quality of resources to prepare for and carry out plant operations from a barge., Minimise the risk of damage to the work and surrounding area during barge operations., Complete the work within the allocated time when preparing to and carrying out work from a barge, Comply with the given contract information to carry out plant operations from a barge to the required specification.

  • Moving, Handling and Storing Resources in the Workplace

    F/503/1171

    Comply with given information when moving, handling and/or storing resources., Know how to comply with relevant legislation and official guidance when moving, handling and/or storing resources., Maintain safe working practices when moving, handling and/or storing resources., Select the required quantity and quality of resources for the methods of work to move, handle and/or store occupational resources., Prevent the risk of damage to occupational resources and surrounding environment when moving, handling and/or storing resources., Complete the work within the allocated time when moving, handling and/or storing resources., Comply with the given occupational resource information to move, handle and/or store resources to the required guidance.

  • Erecting and Dismantling Plant – Cranes and Rigs – in the Workplace

    K/600/8106

    Interpret the given information relating to erecting and dismantling plant., Organise with others the sequence and operation in which erecting and dismantling operations are to be carried out., Know how to comply with relevant legislation and official guidance to carry out erecting and dismantling of plant., Maintain safe working practices when carrying out erecting and dismantling of plant., Request and select the required quantity and quality
    Notice: ob_flush(): failed to flush buffer. No buffer to flush in /home/spg/public_html/cspdev/wp-content/plugins/wp-sheet-editor-premium/modules/universal-sheet/inc/csv-api.php on line 181
    of resources to carry out erecting and dismantling of plant., Minimise the risk of damage to the work and surrounding area when erecting and dismantling plant., Complete the work within the allocated time when erecting and dismantling plant., Comply with the given contract information to erect and dismantle plant to the required specification.

  • Setting Out Secondary Dimensional Work Control in the Workplace

    L/600/8101

    Interpret the given information relating to setting out dimensional control of the work., Know how to comply with relevant legislation and official guidance to set out dimensional control of the work., Maintain safe working practices when setting out dimensional control of the work., Select the required quantity and quality of resources to set out dimensional control of the work., Minimise the risk of damage to the work and surrounding area when setting out dimensional control of the work., Complete the work within the allocated time when setting out dimensional control of the work., Comply with the given contract information to set out dimensional control of the work to the required specification.

  • Slinging and Signalling the Movement of Loads in the Workplace

    R/600/8102

    Interpret the given information relating to the preparation for and the slinging and signalling of loads., Organise with others the sequence and operation in which the slinging and signalling of loads is to be carried out., Know how to comply with relevant legislation and official guidance to carry out slinging and signalling of loads., Maintain safe working practices when preparing for and slinging and signalling loads., Select the required quantity and quality of resources to prepare for and when slinging and signalling loads., Minimise the risk of damage to the work and surrounding area when slinging and signalling loads., Complete the work within the allocated time when preparing to and slinging and signalling loads., Comply with the given contract information to prepare to and sling and signal loads for movement to the required specification.

Check price and availability

  • A member of our training team will contact you with course details, locations and prices.