Modular Building

Modular/Portable Building

Location

National

Accreditation

NVQ

Duration

TBC

Valid for

Lifetime award

About this course

The aim of this qualification is to recognise the knowledge, skills and competence demonstrated by an individual in the workplace. This Level 2 NVQ Diploma in Innovative/Modern Methods of Construction ‐ Modular/Portable Building provides the opportunity for individuals who specialise in modular/portable building to demonstrate their competence. There is also a Level 2 NVQ Certificate in this occupational area. The units in this qualification are derived from National Occupational Standards.

The Rule of Combination (RoC) below specifies the combination of units that need to be achieved for the individual to be awarded the qualification.

Mandatory Units

  • Conforming to General Health, Safety and Welfare in the Workplace.

    A/503/1170

    Comply with all workplace health, safety and welfare legislation requirements., Recognise hazards associated with the workplace that have not been previously controlled and report them in accordance with organisational procedures., Comply with organisational policies and procedures to contribute to health, safety and welfare., Work responsibly to contribute to workplace health, safety and welfare whilst carrying out work in the relevant occupational area., Comply with and support all organisational security arrangements and approved procedures.

  • Moving, Handling and Storing Resources in the Workplace

    F/503/1171

    Comply with given information when moving, handling and/or storing resources., Know how to comply with relevant legislation and official guidance when moving, handling and/or storing resources., Maintain safe working practices when moving, handling and/or storing resources., Select the required quantity and quality of resources for the methods of work to move, handle and/or store occupational resources., Prevent the risk of damage to occupational resources and surrounding environment when moving, handling and/or storing resources., Complete the work within the allocated time when moving, handling and/or storing resources., Comply with the given occupational resource information to move, handle and/or store resources to the required guidance.

  • Conforming to Productive Working Practices in the Workplace

    J/503/1169

    Communicate with others to establish productive work practices., Follow organisational procedures to plan the sequence of work., Maintain relevant records in accordance with the organisational procedures., Maintain good working relationships when conforming to productive working practices.

Optional Units

  • Maintaining Non-structural or Structural Components in the Workplace

    H/503/2717

    Interpret the given information relating to the work and resources when maintaining non-structural or structural components., Know how to comply with relevant legislation and official guidance when maintaining non-structural or structural components., Maintain safe working practices when maintaining non-structural or structural components., Select the required quantity and quality of resources for the methods of work to maintain non-structural or structural components., Minimise the risk of damage to the work and surrounding area when maintaining non-structural or structural components., Complete the work within the allocated time when maintaining non-structural or structural components., Comply with the given contract information to maintain non-structural or structural components to the required specification.

  • Applying Paint Systems by Brush and Roller in the Workplace

    H/503/9683

    Interpret the given information relating to the work and resources when applying paint systems by brush and/or roller., Know how to comply with relevant legislation and official guidance when applying paint systems by brush and/or roller., Maintain safe and healthy working practices when applying paint systems by brush and/or roller., Select the required quantity and quality of resources for the methods of work to apply paint systems by brush and/or roller., Minimise the risk of damage to the work and surrounding area when applying paint systems by brush and/or roller., Complete the work within the allocated time when applying paint systems by brush and/or roller., Comply with the given contract information to apply paint systems by brush and/or roller to the required specification.

  • Installing First Fixing Components in the Workplace

    K/503/3402

    Interpret the given information relating to the work and resources when installing first fixing components., Know how to comply with relevant legislation and official guidance when installing first fixing components., Maintain safe working practices when installing first fixing components., Select the required quantity and quality of resources for the methods of work to install first fixing components., Minimise the risk of damage to the work and surrounding area when installing first fixing components., Complete the work within the allocated time when installing first fixing components., Comply with the given contract information to install first fixing components to the required specification.

  • Installing Basic Plumbing in the Workplace

    R/600/7483

    Interpret the given information relating to the work and resources when installing basic plumbing., Know how to comply with relevant legislation and official guidance when installing basic plumbing., Maintain safe working practices when installing basic plumbing., Select the required quantity and quality of resources for the methods of work to install basic plumbing., Minimise the risk of damage to the work and surrounding area when installing basic plumbing., Complete the work within the allocated time when installing basic plumbing., Comply with the given contract information to install basic plumbing to the required specification.

  • Slinging and Signalling the Movement of Loads in the Workplace

    R/600/8102

    Interpret the given information relating to the preparation for and the slinging and signalling of loads., Organise with others the sequence and operation in which the slinging and signalling of loads is to be carried out., Know how to comply with relevant legislation and official guidance to carry out slinging and signalling of loads., Maintain safe working practices when preparing for and slinging and signalling loads., Select the required quantity and quality of resources to prepare for and when slinging and signalling loads., Minimise the risk of damage to the work and surrounding area when slinging and signalling loads., Complete the work within the allocated time when preparing to and slinging and signalling loads., Comply with the given contract information to prepare to and sling and signal loads for movement to the required specification.

  • Maintaining Non-structural Carpentry Work in the Workplace

    T/503/2642

    Interpret the given information relating to the work and resources when maintaining non-structural carpentry work., Know how to comply with relevant legislation and official guidance when maintaining non-structural carpentry work., Maintain safe working practices when maintaining non-structural carpentry work., Select the required quantity and quality of resources for the methods of work to maintain non-structural carpentry work., Minimise the risk of damage to the work and surrounding area when maintaining non-structural carpentry work., Complete the work within the allocated time when maintaining non-structural carpentry work., Comply with the given contract information to maintaining non-structural carpentry work to the required specification.

  • Installing and Dismantling Prefabricated Portable Cabins and Units in the Workplace

    D/600/7146

    Interpret the given information relating to the work and resources when installing and dismantling portable cabins and units., Know how to comply with relevant legislation and official guidance when installing and dismantling portable cabins and units., Maintain safe working practices when installing and dismantling portable cabins and units., Select the required quantity and quality of resources for the methods of work to install and dismantle portable cabins and units., Minimise the risk of damage to the work and surrounding area when installing and dismantling portable cabins and units., Complete the work within the allocated time when installing and dismantling portable cabins and units., Comply with the given contract information to install and dismantle prefabricated portable cabins and units to the required specification.

  • Installing and Dismantling Prefabricated Modular Building Structures in the Workplace

    L/600/7143

    Interpret the given information relating to the work and resources when installing and dismantling prefabricated modular buildings., Know how to comply with relevant legislation and official guidance when installing and dismantling prefabricated modular buildings., Maintain safe working practices when installing and dismantling prefabricated modular buildings., Select the required quantity and quality of resources for the methods of work to install and dismantle prefabricated modular buildings., Minimise the risk of damage to the work and surrounding area when installing and dismantling prefabricated modular buildings., Complete the work within the allocated time when installing and dismantling prefabricated modular buildings., Comply with the given contract information to install and dismantle prefabricated modular building structures to the required specification.

Check price and availability

  • A member of our training team will contact you with course details, locations and prices.